Dung Quat Steel Plant, Vietnam
![Betterground Operator Guidance System assures real time plot of estimated column diameter over depth](https://www.betterground.com/wp-content/uploads/2019/01/GOPR4291.jpg)
![Wide angle photo of BC1 and the Water/Air supply hoses to the rig. Water is used during penetration in hard layers.](https://www.betterground.com/wp-content/uploads/2019/01/GOPR4287.jpg)
![](https://www.betterground.com/wp-content/uploads/2019/01/IMG_0627.jpg)
![](https://www.betterground.com/wp-content/uploads/2019/01/IMG_0590.jpg)
![BC1 with skip bucket and loader to supply gravel.](https://www.betterground.com/wp-content/uploads/2019/01/IMG_0566.jpg)
Gallery
![Betterground Operator Guidance System assures real time plot of estimated column diameter over depth](https://www.betterground.com/wp-content/uploads/2019/01/GOPR4291.jpg)
![Wide angle photo of BC1 and the Water/Air supply hoses to the rig. Water is used during penetration in hard layers.](https://www.betterground.com/wp-content/uploads/2019/01/GOPR4287.jpg)
![](https://www.betterground.com/wp-content/uploads/2019/01/IMG_0627.jpg)
![](https://www.betterground.com/wp-content/uploads/2019/01/IMG_0590.jpg)
![BC1 with skip bucket and loader to supply gravel.](https://www.betterground.com/wp-content/uploads/2019/01/IMG_0566.jpg)
Method Applied
Bottom Feed Stone Columns
Average Depth
14 m
Bottom Feed Stone Columns installed to 14 m depth with BC1 rig for a Steel Plant in Dung Quat, Vietnam