Central Link Light Rail – Beacon Hill Project
![](https://www.betterground.com/wp-content/uploads/2016/04/Screen-Shot-2016-04-09-at-17.23.52.png)
Provide instant stability, accelerate drainage and prevent liquefaction for an up to 12 m (40 ft) high road embankment on soft to very soft silt and clay with some peat layers. Below an only 0.5 m dry crust, in some locations the soil is so soft that equipment as shown in the photo below would sink in without the presence of a geotextile reinforced work platform.